Project Description: Earthworks, Civil Foundations, Structural Steel Erection, Piping Installation, Equipment Setting and I&E.
Key Stats:
• 62,000 Linear Feet of Piping
• 1,400 Tons of Steel
• 25 Acres Site Work
• 3,100 Linear Feet of Concrete Trench
• 76,000 Square Feet of Concrete Paving
• 6,000 Cubic Yards of Concrete Overall
• 15,000 Linear Feet Underground HDPE Storm Water System
• 34,000 Square Yards Heavy Haul Road
• 2,500 Linear Feet Tank Levee
• 75+ Pieces of Equipment
• Wiring – 325,000 ft.
• Conduit – 60,000 ft.
• Cable Tray – 16,000 ft.
• Heat Tracing – 45,000 ft.
• Peak Headcount –250